BEGINNER
Bharatiya Pathshala
Opening preparation notes...
Bharatiya Pathshala
Opening preparation notes...
Quantitative Aptitude / Arithmetic
Work rates, combined work, efficiency, and pipes.
Listen and follow along. Progress stays on this browser. No login needed.
Start with the basics
A work rate says what fraction of a job is finished in one unit of time. Add rates when people work together without interfering.
A machine fills a tank in 4 hours. What fraction does it fill in 1 hour at a constant rate?
Remember: Add fractions of work per hour, not the hours needed to finish.
Log in to save highlights and answer practice questions. Select text in a note, then choose a highlight colour. On mobile, touch and hold to select. Choose Save highlights or Save changes to save to your account. You’ll be prompted before leaving unsaved study changes.
BEGINNER
BEGINNER
BEGINNER
Prioritise common arithmetic, number properties and algebra. Label units before applying formulas.
Start with arithmetic and algebra. Check domain restrictions and use estimation before long calculations; specialised topics are supporting preparation.
Build reliable arithmetic and chart reading first. Keep speed proportional to certainty and verify the base of percentage changes.
Budget time within the section. In data sufficiency, separate the two statements before combining them.
Combine common quantitative skills with accurate interpretation of unfamiliar data. Recheck units and assumptions.
Use arithmetic and elementary algebra with logical checks. Avoid importing geometry or specialist CAT topics into the study plan.
Choose a fast method only after identifying the base and units. In sufficiency questions, test uniqueness rather than calculating unnecessarily.
BEGINNER
Constant rate: one full tank in 4 hours.
Rate = 1 ÷ completion time
Combined rate = sum of signed rates
Source record: Bharatiya Pathshala — original illustrated lessons.
BEGINNER
Combined rate = 1/a + 1/b
Joint time = ab/(a+b) for a,b>0
Source record: Bharatiya Pathshala — reviewed preparation lessons.
Net pipe rate = sum of inlet rates − sum of outlet rates
Clock separation before reduction = |30H − 5.5M| degrees
Source record: Bharatiya Pathshala — reviewed preparation lessons.