BEGINNER
Bharatiya Pathshala
Opening preparation notes...
Bharatiya Pathshala
Opening preparation notes...
Data Interpretation & Logical Reasoning / Analytical reasoning
Connected paths, project order, time slots, and best feasible outcomes.
Listen and follow along. Progress stays on this browser. No login needed.
Start with the basics
A network connects places or tasks. A route follows connections; a schedule puts tasks in time order.
A path from A to B takes 4 minutes and B to C takes 3. If there is no waiting, how long does A to B to C take?
Remember: The route with the fewest connections is not always the quickest.
Log in to save highlights and answer practice questions. Select text in a note, then choose a highlight colour. On mobile, touch and hold to select. Choose Save highlights or Save changes to save to your account. You’ll be prompted before leaving unsaved study changes.
BEGINNER
Solve linked sets, not just isolated calculations. Select sets by clarity of constraints; build one representation for all questions.
Explain the idea in your own words before opening the answer. Then apply it to the example.
Explain the main rule in routes and networks, then apply it to a small example. State the assumption that makes your reasoning valid.
Review the noteRepresent places as vertices and allowed journeys as edges. Distinguish the shortest route from the route with the fewest edges.
Worked example: A-B costs 2, B-C costs 3 and A-C costs 8. The two-edge route A-B-C costs 5 and is cheaper than the direct edge.
Explain the main rule in scheduling, then apply it to a small example. State the assumption that makes your reasoning valid.
Review the noteA schedule must respect prerequisites and resource conflicts. Earliest finish for a dependent task uses the latest prerequisite finish, not their sum when tasks run in parallel.
Worked example: A takes 2 hours and B takes 3, starting together. C takes 4 hours and requires both. C starts at hour 3 and finishes at hour 7.
Explain the main rule in optimization, then apply it to a small example. State the assumption that makes your reasoning valid.
Review the noteA good optimum needs both a bound and a construction that achieves it. One workable answer proves feasibility, not optimality.
Worked example: Two machines can each process 4 jobs per hour. Ten jobs need at least 10/8 hours in a divisible-work model. If jobs are indivisible and each lasts 15 minutes, schedule five per machine to achieve 75 minutes.
BEGINNER
No waiting is included in this route.
Route time = travel times + waiting times
Source record: Bharatiya Pathshala — original illustrated lessons.
BEGINNER
BEGINNER
BEGINNER